@MastersThesis{Aranha:2020:DeCoIm,
author = "Aranha, Paula Renata dos Reis",
title = "Detalhamento, compara{\c{c}}{\~a}o e implementa{\c{c}}{\~a}o
da redu{\c{c}}{\~a}o de esfor{\c{c}}os dentre um novo conjunto
de processos para melhorar a dependabilidade de sistemas
espaciais",
school = "Instituto Nacional de Pesquisas Espaciais (INPE)",
year = "2020",
address = "S{\~a}o Jos{\'e} dos Campos",
month = "2020-04-17",
keywords = "detalhamento de processos, processo de redu{\c{c}}{\~a}o de
esfor{\c{c}}os, dependabilidade, melhoria em processos,
gerenciamento do ciclo de vida de projetos, processes detailing,
derating process, dependability, processes improvement, project
lifecycle management.",
abstract = "Sistemas complexos e/ ou altamente integrados como sat{\'e}lites,
avi{\~o}es, controles de tr{\'a}fego a{\'e}reo,
autom{\'o}veis, etc., requerem avalia{\c{c}}{\~o}es da
Dependabilidade (Confiabilidade, Manutenabilidade,
Disponibilidade, etc.) em todo o seu ciclo de vida, principalmente
na fase de desenvolvimento, onde os prazos e custos para realizar
mudan{\c{c}}as s{\~a}o menores. Estes sistemas devem atingir
altos n{\'{\i}}veis de Dependabilidade atrav{\'e}s de uma
diversidade de abordagens e processos. E dentre estes se destacam
os processos de an{\'a}lises e tomadas de decis{\~o}es desde a
fase de concep{\c{c}}{\~a}o at{\'e} a fase final do projeto
detalhado, pois nestas s{\~a}o tomadas as decis{\~o}es mais
importantes. Al{\'e}m disto, tais processos devem ser avaliados e
melhorados progressivamente (como preconizado pela ABNT ISO
9001/2015). Geralmente, n{\~a}o se encontram na literatura
detalhamentos sobre processos de Dependabilidade, e sim sobre
requisitos de Dependabilidade, estes definidos em normas. Desta
forma, por meio da busca em: 1) capacitar a
organiza{\c{c}}{\~a}o, 2) estabelecer processos e 3) reduzir
custos adicionais e atrasos em projetos de sat{\'e}lites, o
objetivo deste trabalho {\'e} Detalhar, Comparar e Implementar a
Redu{\c{c}}{\~a}o de Esfor{\c{c}}os (Derating) dentre um Novo
Conjunto de Processos para melhorar a Dependabilidade de Sistemas
Espaciais. Para isso: 1) detalha dois processos propostos por
Rabello (2017) relacionados {\`a} Redu{\c{c}}{\~a}o de
Esfor{\c{c}}os (um de Engenharia da Dependabilidade e um de
Garantia da Dependabilidade); 2) detalha o processo atual
correspondente aos dois processos mencionados; 3) compara o
detalhamento dos processos propostos com o detalhamento do
processo atual; 4) por meio da opini{\~a}o de especialistas/
conhecedores da {\'a}rea de Dependabilidade/ Confiabilidade: a)
verifica e valida o detalhamento dos processos (propostos e atual)
e b) avalia a compara{\c{c}}{\~a}o; e, por fim, 5) implementa
uma parte dos processos propostos na ferramenta computacional PLM
Windchill®. Conforme as considera{\c{c}}{\~o}es dos
especialistas (Ap{\^e}ndices C e D deste trabalho), conclui-se
que os processos propostos detalhados de Engenharia e de Garantia
(relacionados ao Derating) s{\~a}o mais proveitosos que o
processo atual, pois: 1) pode reduzir o risco de haver n{\~a}o
conformidades; 2) pode ser considerado mais eficiente, com
rela{\c{c}}{\~a}o ao prazo e ao custo total do projeto; 3) pode
ser considerado mais eficaz no atendimento aos requisitos e no
atingimento dos objetivos; 4) pode ser considerado: a) uma
melhoria aplic{\'a}vel em processos ao INPE e {\`a}s Empresas
fornecedoras, e; b) uma melhoria em processos aceit{\'a}vel pelo
INPE e pelas Empresas fornecedoras. Tudo isso busca por resultados
vantajosos esperados em termos de prazos, custos e qualidade em um
projeto. E ao estabelecer processos (determinar o como deve ser
feito atrav{\'e}s da defini{\c{c}}{\~a}o de suas atividades)
ir{\'a} auxiliar o planejamento, as tomadas de decis{\~o}es e o
controle de todas as atividades realizadas pelo grupo de
Dependabilidade e, de um modo geral, pelas
organiza{\c{c}}{\~o}es (INPE e Empresas fornecedoras). ABSTRACT:
Complex and/ or highly integrated systems such as satellites,
airplanes, air traffic controllers, cars, etc., require
Dependability (Reliability, Maintainability, Availability, Safety,
Security, etc.) assessments throughout their life cycle,
especially in their development, where the time and cost to make
changes are smaller. Such systems must achieve high levels of
Dependability through a variety of approaches and processes. Among
these, the processes of analysis and decision making from the
conception phase to the final phase of the detailed project stand
out, because in these phases the most important decisions are
taken. Furthermore, these processes must be evaluated and improved
progressively (as recommended by ABNT ISO 9001/2015). Generally,
Dependability processes detailing is not found in the literature,
but on Dependability requirements, which are defined in standards.
Thus, through the search for: 1) capacitating the organization, 2)
establishing processes and 3) reducing additional costs and delays
in satellite projects, the objective of this work is to Detail,
Compare and Implement the Derating among a New Set of Processes to
improve the Dependability of Space Systems. For this: 1) details
two processes proposed by Rabello (2017) related to Derating (one
of Dependability Engineering and one of Dependability Assurance);
2) details the current process corresponding to the two mentioned
processes; 3) compares the proposed processes detailing with the
current process detailing; 4) through the opinion of experts/
knowledgeable in the Dependability/ Reliability area: a) verifies
and validates the processes detailing (proposed and current) and
b) evaluates the comparison; and 5) implements part of the
proposed processes in the computational tool PLM Windchill®.
According to the experts' considerations (Appendices C and D of
this work), it can be concluded that the proposed processes
detailing of Engineering and Assurance (related to Derating) are
more beneficial than the current process, because: 1) it can
reduce the risk of having nonconformance; 2) it can be considered
more efficient, with respect to the term and the total cost of the
project; 3) it can be considered more effective in compliance with
the requirements and achieving the objectives; 4) can be
considered: a) an improvement applicable in processes to INPE and
its supplier companies, and; b) an improvement in processes
acceptable to INPE and its supplier companies. All of this seeks
to obtain expected results in terms of deadlines, costs and
quality in a project. And by establishing processes (determining
how it should be done by defining its activities) it will assist
in the planning, decision making and control of all activities
carried out by the Dependability group and, in general, by the
organizations (INPE e its supplier companies).",
committee = "Perondi, Leonel Fernando (presidente) and Souza, Marcelo Lopes de
Oliveira e (orientador) and Rabello, Ana Paula de S{\'a} Santos
(orientadora) and Brito, Al{\'{\i}}rio Cavalcanti de and
Moreira, Fernando Jos{\'e} de Oliveira",
englishtitle = "Detailing, comparison and implementation of the derating process
within a new set of processes to improve the dependability of
space systems",
language = "pt",
pages = "391",
ibi = "8JMKD3MGP3W34R/42C2J62",
url = "http://urlib.net/ibi/8JMKD3MGP3W34R/42C2J62",
targetfile = "publicacao.pdf",
urlaccessdate = "28 abr. 2024"
}